The concrete guys had bent up this dust collection pipe, which serves the planer and jointer. I buried it under a 5 gallon bucket, while they finished the rest of the pour. After cutting the bucket off I still had to remove more of the floor to gain access to the pipe. It needs a piece about 22.5 degrees and 10 inches tall to get me back at the right height, then fill the hole back up with a bag of concrete. Good as new again.

back to more pics