The concrete guys had bent up this dust collection pipe, which
serves the planer and jointer. I buried it under a 5 gallon bucket, while they
finished the rest of the pour. After cutting the bucket off I still had to
remove more of the floor to gain access to the pipe. It needs a piece about 22.5
degrees and 10 inches tall to get me back at the right height, then fill the
hole back up with a bag of concrete. Good as new again.