Hall bath remodel

(This page last updated 09/13/07)

(back to remodeling page)

Project started 03/05 - Completed 9/07

Even though we had gutted the master bath, and it is still not finished, we had to work on the hall bath because of water damage. It ends up being a total gut and redo. On the up side we are making progress. The 12" vinyl floor tiles are done. I had them done in about 2 hours, including going back to Lowe's to get the one tile I was short!  The new tub and surround are acrylic. The new valve is a ceramic disc style (will last for ever). Labor day weekend my brother and I put in the wainscoting and molding. It is painted so now I can put the toilet back in.

Fast forward to September 2007 and I have just put the finishing touches on the hall bath. It is now been wallpapered, the towel bars installed, a timer for the exhaust fan installed, and new accessories  placed out.